Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for Professional Design 3p New Copper 42W MCB Pan Assembly in Power System, We usually concertrating on acquiring new creative products to fulfill request from our clientele all around the world. Be a part of us and let’s make driving safer and funnier jointly!
Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for China 42W Pan Assembly and Circuit Breaker Pan Assembly, Our company regards “reasonable prices, high quality,efficient production time and good after-sales service” as our tenet. We hope to cooperate with more customers for mutual development and benefits in future. Welcome to contact us.
Standard | IEC/EN 60898-1 | ||||
Pole No | 1P,1P+N, 2P, 3P,3P+N,4P | ||||
Rated voltage | AC 230V/400V | ||||
Rated Current(A) | 1A,2A,3A,4A,6A,10A,16A,20A,25A,32A,40A,50A,63A | ||||
Tripping curve | B, C, D | ||||
Rated short-circuit capacity(lcn) | 6000A | ||||
Rated frequency | 50/60Hz | ||||
Rated impulse withstand voltage Uimp | 4kV | ||||
Connection terminal | Pillar terminal with clamp | ||||
Mechanical life | 20,000 Cycles | ||||
Electrical life | 4000 Cycles | ||||
Protection degree | IP20 | ||||
Connection capacity | Flexible conductor 35mm² | ||||
Rigid conductor 50mm² | |||||
Installation | On symmetrical DIN rail 35mm | ||||
Panel mounting |
Test | Tripping Type | Test Current | Initial State | Tripping timeor Non-tripping Time Provisior | |
a | Time-delay | 1.13In | Cold | t≤1h(In≤63A) t≤2h(ln>63A) |
No Tripping |
b | Time-delay | 1.45In | After test a | t<1h(In≤63A) t<2h(In>63A) |
Tripping |
c | Time-delay | 2.55In | Cold | 10s<t<60s(In≤63A) 20s<t<120s(In>63A) |
Tripping |
d | B curve | 3In | Cold | t≤0.1s | No Tripping |
C curve | 5In | Cold | t≤0.1s | No Tripping | |
D curve | 10In | Cold | t≤0.1s | No Tripping | |
e | B curve | 5In | Cold | t≤0.1s | Tripping |
C curve | 10In | Cold | t≤0.1s | Tripping | |
D curve | 20In | Cold | t≤0.1s | Tripping |
Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for Professional Design 3p New Copper 42W MCB Pan Assembly in Power System, We usually concertrating on acquiring new creative products to fulfill request from our clientele all around the world.
Professional Design China 42W Pan Assembly and Circuit Breaker Pan Assembly, Our company regards “reasonable prices, high quality,efficient production time and good after-sales service” as our tenet. We hope to cooperate with more customers for mutual development and benefits in future. Welcome to contact us.